from FileHippo.com http://bit.ly/2DpO8jh
jeudi 31 janvier 2019
Driver Genius 19.0.0.139
from FileHippo.com http://bit.ly/2DpO8jh
EasyMorph 3.9.2.5
from FileHippo.com http://bit.ly/2jRjtGK
mercredi 30 janvier 2019
An infinite loop of sunrise and sunset at the Barbican
A huge 24 metre length of slowly moving photographic film is currently turning in an endless loop in the heart of the Barbican.
It’s a large scale installation by the contemporary art group, Troika that transforms the Lightwell of the Barbican into a setting for an artificial infinite loop of sunset and sunrise, or as they put it… “creating rather than recording reality, it blurs the boundaries between experience and physical spheres, natural and man–made spaces.”
The transparent photographic film was coloured to create the sunset and sunrise colours, and was especially designed to fit into the Barbican’s lightwell space — so it flows between two floors.
It also rotates very slowly. Just about fast enough that a minute or so will show a decent level of change, but sufficiently slowly that anyone looking at it for a while will look a bit odd as they “contemplate” a sheet of plastic hanging in the air.
Although in essence, it’s a fairly simple idea wrapped up in the usual arty lingo, it’s a pleasing effect.
The rotating film will be rotating until sometime in May.
from IanVisits http://bit.ly/2CZRmLE
Maxim Integrated Introduces Chip That Safeguards Data by Erasing It
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2Tma8n9
Maxim Integrated's Chips Erase Data to Prevent It From Being Stolen
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2ShJfnd
Maxim Integrated Moves Stronger Security into a Single Chip
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2WuKe2u
Maxim Integrated Introduces Chips to Oversee Sensitive Data
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2HQ8f0C
Maxim Integrated's New Chips Serve as Security Supervisors
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2Smh7Q0
“Sun in a Box”: A New Way to Store Renewable Energy for the Grid
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2HFFSSN
Maxim Integrated Introduces a Single Chip to Secure Devices
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2SfRL5X
Maxim Integrated's One Chip to Secure Them All
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2HGVJ3K
Path to Systems: A SiP of Reliable Advantage—Systems Under Test
from Electronic Design - Engineering Essentials Curated By Experts http://bit.ly/2CXHWju
Westminster Council plans to pedestrianise part of Strand
Having only just cancelled plans to pedestrianize Oxford Street, Westminster Council has now announced plans to pedestrianize part of Strand instead.
The £28 million scheme, if approved, could see a section of Strand around Aldwych pedestrianized and road traffic diverted around the former BBC building instead.
That’ll see the famous St Mary le Strand church become far more accessible as it’ll cease to be marooned in a traffic island.
Once the vehicular traffic is largely removed a 350m long public space is created. Historically, the Strand has always been an important east/west route connecting Westminster Abbey to St. Paul’s and has been used as a processional route for ceremonies such as Queen Victoria’s Diamond Jubilee in 1897. It is no longer used as a formal processional route, however the plans have had to allow for that possibility once more.
The new space is not exclusively for pedestrians either, as the paved space will be shared with cyclists, probably in recognition that it would be anyway, so better to design that usage in at the start.
There’s also suggestions in the consultation documents that they want to increase the amount of commercial space in the area, although that’s not fleshed out in any detail.
As for the semi-circle road that will remain, it will also be narrowed so that the pavement space can be roughly doubled in width.
The documents are rather rich on aspiration, but currently fairly weak on the details of the pedestrianization, mainly focusing on the research carried out so far rather than the final product they aim to deliver.
The consultation will run until 13th March.
from IanVisits http://bit.ly/2DJofxA










