We have reached a unique moment in time—we're ramping two volume production nodes (20 and 16/14 nm), entering risk production (10 nm) on a third node, and starting development on a fourth (7 nm).
from Electronic Design http://bit.ly/1KODhhj
everything is tech
0 commentaires:
Enregistrer un commentaire